Mon-Sun

24h Emergency Service

Trouble Shooting

Form Download

Call Today 1.800.887.2058

Toronto Ontario

MAINTENANCE PLAN

Checking and Inspecting 21 points inspection ,

 

Furnace with heating portion :

 

Priority Checking and key measurements

*Checking operation of condensation system

*Checking operating pressures and temperature of equipment

*Testing Unit through full operational and safety cycle per manufacturer’s specifications

*Checking the flame signal or thermonuclear and power pilot output

* Inspecting masonry chimney, cleanout, vent system integrity and venting action

*Checking current draw on fan/inducer fan/pump motor

*Checking ambinet CO with ppm level

*Checking Flue CO with ppm Level

*Checking Input or manifold pressure

*Checking supply temperature

*Checking return temperature

 

Safety checking

*Checking Warning tag issued

*Checking CO detector present

 

Reliability and comfort checking

*Checking equipment condition

*Checking age of equipment (years)

*Checking humidity control type

(Flow through includes similar systems)

*Checking thermostat type

*Checking air filtration condition

*Checking Last duct Cleaning (years) \

 

Energy Efficiency

*Checking Equipment energy efficiency (AFUE)

*Checking gas and Electricity savings when replacing with high efficiency equipment

Contact Us